
Water Collection Tank Design
Nebo Project Engineers (South32 Illawarra Coal – New South Wales, Australia) Nebo Project Engineers required design and structural assessment of an underground bore water collection tank for Avon 13 Pump Station. Design of the water collection tank shell, nozzles and supports was required in accordance with standards AS 1210 and