Zinc Refinement Plant Platform Weld Detail Design Verification

Finite element model showing structural weld detail analysis of platform and pipe rack at SMC Townsville Zinc Refinery, used for AS 4100 compliance verification.

NWEC (SMC – Townsville, Queensland, Australia)

NWEC required stress analysis and design verification of weld details on a cooling tower platform, pipe rack, reactor sub-rack and leaching tank platform for the SMC Townsville Zinc Refinery Plant (Townsville, Queensland). Stress analysis of the cooling tower platform structure, pipe rack, reactor sub-rack and leaching tank platform was required to be performed in accordance with standard AS 4100 to confirm structural integrity of the reinforcement plate weld details at typical connections (with worst case load actions) considering combined permanent, imposed (platform, piping), wind and seismic loads as per standards AS/NZS 1170.0, AS/NZS 1170.2 and AS 1170.4.

What we did:

Outcome:

Avesta Consulting verified compliance of the specified welded joint details of the cooling tower platform, pipe rack, sub-rack, reactor platform and leaching tank platform with standard AS 4100 and provided RPEQ certification.