Redpath Australia (Snowy Hydro – Tumut, New South Wales, Australia)

Redpath Australia required impact analysis of a travelling platform for the Tumut 1 Power Station Machine Hall Rehabilitation Project (Snowy Hydro). Impact analysis of the travelling platform was required to determine structural performance of the platform following a falling rock impact loading event. Impact loads were determined and applied at locations that would have worst effect on the structure, with elastic-plastic material and large deflection behaviour considered to verify overall structural integrity.  

What we did:

Outcome:

Avesta Consulting concluded that the structure had sufficient strength and ductility to resist a falling rock impact load considering multiple impact locations.