VME Process WHRU Structural Assessment

Finite element contour plot of a waste heat recovery unit with its exhaust stack and ducting

Clyde Bergemann Australia (VME Process – Alaska, USA)

Clyde Bergemann Australia required thermal-structural assessment of a waste heat recovery unit (WHRU) for VME Process Asia Pacific (Pikka Development Project) to verify design compliance with the intent of standard AISC 360-10 and ASME STS-1 applying project specific dead, thermal, internal pressure, wind, motion, seismic, blast and lifting loads.

What we did:

Outcome:

Avesta Consulting verified compliance of the WHRU ducting/casing and exhaust stack designs with the requirements of standards AISC 360-10 and ASME STS-1 considering dead, thermal, internal pressure, wind, motion, seismic blast and lifting loads.